Ajude o site desativando o bloqueador de anúncio
Cabeçalho

Include P12 V2 - QPPA320

Autor: Eurai Criado: 01/01/2026 Atualizado: 01/01/2026 Protheus
Postagem

Salve salve, blz?

 

 

Include P12 V2. Grupo QPPA320 — 6 arquivo(s).

 

QPPA320.CH

 #DEFINE STR0001 FWI18NLang("QPPA320","STR0001",1)
#DEFINE STR0002 FWI18NLang("QPPA320","STR0002",2)
#DEFINE STR0003 FWI18NLang("QPPA320","STR0003",3)
#DEFINE STR0004 FWI18NLang("QPPA320","STR0004",4)
#DEFINE STR0005 FWI18NLang("QPPA320","STR0005",5)
#DEFINE STR0006 FWI18NLang("QPPA320","STR0006",6)
#DEFINE STR0007 FWI18NLang("QPPA320","STR0007",7)
#DEFINE STR0008 FWI18NLang("QPPA320","STR0008",8)
#DEFINE STR0009 FWI18NLang("QPPA320","STR0009",9)
#DEFINE STR0010 FWI18NLang("QPPA320","STR0010",10)
#DEFINE STR0011 FWI18NLang("QPPA320","STR0011",11)
#DEFINE STR0012 FWI18NLang("QPPA320","STR0012",12)
#DEFINE STR0013 FWI18NLang("QPPA320","STR0013",13)
#DEFINE STR0014 FWI18NLang("QPPA320","STR0014",14)
#DEFINE STR0015 FWI18NLang("QPPA320","STR0015",15)
#DEFINE STR0016 FWI18NLang("QPPA320","STR0016",16)
#DEFINE STR0017 FWI18NLang("QPPA320","STR0017",17)
#DEFINE STR0018 FWI18NLang("QPPA320","STR0018",18)
#DEFINE STR0019 FWI18NLang("QPPA320","STR0019",19)
#DEFINE STR0020 FWI18NLang("QPPA320","STR0020",20)
#DEFINE STR0021 FWI18NLang("QPPA320","STR0021",21)
#DEFINE STR0022 FWI18NLang("QPPA320","STR0022",22)
#DEFINE STR0023 FWI18NLang("QPPA320","STR0023",23)
#DEFINE STR0024 FWI18NLang("QPPA320","STR0024",24)
#DEFINE STR0025 FWI18NLang("QPPA320","STR0025",25)
#DEFINE STR0026 FWI18NLang("QPPA320","STR0026",26)
#DEFINE STR0027 FWI18NLang("QPPA320","STR0027",27)
#DEFINE STR0028 FWI18NLang("QPPA320","STR0028",28)
#DEFINE STR0029 FWI18NLang("QPPA320","STR0029",29)
#DEFINE STR0030 FWI18NLang("QPPA320","STR0030",30)
#DEFINE STR0031 FWI18NLang("QPPA320","STR0031",31)
#DEFINE STR0032 FWI18NLang("QPPA320","STR0032",32)
#DEFINE STR0033 FWI18NLang("QPPA320","STR0033",33)
#DEFINE STR0034 FWI18NLang("QPPA320","STR0034",34)
#DEFINE STR0035 FWI18NLang("QPPA320","STR0035",35)
#DEFINE STR0036 FWI18NLang("QPPA320","STR0036",36)
#DEFINE STR0037 FWI18NLang("QPPA320","STR0037",37)
#DEFINE STR0038 FWI18NLang("QPPA320","STR0038",38)
#DEFINE STR0039 FWI18NLang("QPPA320","STR0039",39)
#DEFINE STR0040 FWI18NLang("QPPA320","STR0040",40)
#DEFINE STR0041 FWI18NLang("QPPA320","STR0041",41)
#DEFINE STR0042 FWI18NLang("QPPA320","STR0042",42)
#DEFINE STR0043 FWI18NLang("QPPA320","STR0043",43)
#DEFINE STR0044 FWI18NLang("QPPA320","STR0044",44)
#DEFINE STR0045 FWI18NLang("QPPA320","STR0045",45)
#DEFINE STR0046 FWI18NLang("QPPA320","STR0046",46)
#DEFINE STR0047 FWI18NLang("QPPA320","STR0047",47)
#DEFINE STR0048 FWI18NLang("QPPA320","STR0048",48)
#DEFINE STR0049 FWI18NLang("QPPA320","STR0049",49)
#DEFINE STR0050 FWI18NLang("QPPA320","STR0050",50)
#DEFINE STR0051 FWI18NLang("QPPA320","STR0051",51)
#DEFINE STR0052 FWI18NLang("QPPA320","STR0052",52)
#DEFINE STR0053 FWI18NLang("QPPA320","STR0053",53)
#DEFINE STR0054 FWI18NLang("QPPA320","STR0054",54)
#DEFINE STR0055 FWI18NLang("QPPA320","STR0055",55)
#DEFINE STR0056 FWI18NLang("QPPA320","STR0056",56)
#DEFINE STR0057 FWI18NLang("QPPA320","STR0057",57)
#DEFINE STR0058 FWI18NLang("QPPA320","STR0058",58)
#DEFINE STR0059 FWI18NLang("QPPA320","STR0059",59)
#DEFINE STR0060 FWI18NLang("QPPA320","STR0060",60)
 

QPPA320_EN.TRES

 0001#STR0001#ALL#Search
0002#STR0002#ALL#View
0003#STR0003#ALL#Add
0004#STR0004#ALL#Edit
0005#STR0005#ALL#Delete
0006#STR0006#ALL#Checklist APQP - A8 CONTROL PLAN
0007#STR0007#ALL#Yes
0008#STR0008#ALL#No
0009#STR0009#ALL#View/Print
0010#STR0010#ALL#Item - Question
0011#STR0011#ALL#Yes/No
0012#STR0012#ALL#Comments/Required Action
0013#STR0013#ALL#Responsible
0014#STR0014#ALL#Estimated Dt
0015#STR0015#ALL# Methodology of control plan referenced in 
0016#STR0016#ALL#    Section 6 used in the preparation of the control plan ?
0017#STR0017#ALL# Were all customer concerns 
0018#STR0018#ALL#    to make the selection of special characteristics
0019#STR0019#ALL#    of products/process easier ?
0020#STR0020#ALL# All special features of product/process 
0021#STR0021#ALL#    included in the control plan ?
0022#STR0022#ALL# Were SFMEA, DFMEA and PFMEA used to prepare 
0023#STR0023#ALL#    the contol plan ?
0024#STR0024#ALL# All material specifications that require 
0025#STR0025#ALL#    inspection identified ?
0026#STR0026#ALL# Control plan indicates receipt (material and 
0027#STR0027#ALL#    components) through the processing/assembly
0028#STR0028#ALL#    including the packing?
0029#STR0029#ALL# Engineering test requirements were 
0030#STR0030#ALL#    identified ?
0031#STR0031#ALL# Measurement devices and test equipment are 
0032#STR0032#ALL#    according to what was required by the control plan ?
0033#STR0033#ALL# If necessary, did the customer approve the control plan?
0034#STR0034#ALL# Measurement methods are compatible between 
0035#STR0035#ALL#     supplier and customer?
0036#STR0036#ALL#Print
0037#STR0037#ALL#Viw/Prn
0038#STR0038#ALL#N/a
0039#STR0039#ALL#Was Methodology of control plan, described  
0040#STR0040#ALL#in Chapter 6 of APQP manual, used to  
0041#STR0041#ALL#design the control plan?
0042#STR0042#ALL#Were all controls identified in PFMEA  
0043#STR0043#ALL#added to control plan?
0044#STR0044#ALL#Were DFMEA and PFMEA used to prepare  
0045#STR0045#ALL#the control plan?
0046#STR0046#ALL#Were test requirements of engineering performance 
0047#STR0047#ALL#and dimensional requirements identified? 
0048#STR0048#ALL#Are methodology and measurement devices 
0049#STR0049#ALL#compatibility prepared to meet customer 
0050#STR0050#ALL#requirements?
0051#STR0051#ALL#Was the analysis of measurement systems finished  
0052#STR0052#ALL#according to customer requirements?
0053#STR0053#ALL#Were sizes of samples based on regulations of 
0054#STR0054#ALL#industry, statistical tables of sampling plan 
0055#STR0055#ALL#or other methods of process control?
0056#STR0056#ALL#A8 Control Plan in different version 
0057#STR0057#ALL#This Check List of Control Plan  
0058#STR0058#ALL#was made in a different version from the one configured in parameter V_QAPQPED.
0059#STR0059#ALL# Change this parameter content in Configurator so you can View, Delete and Change this List.
0060#STR0060#ALL# 2ND EDITION APQP 
 

QPPA320_ES.TRES

 0001#STR0001#ALL#Buscar
0002#STR0002#ALL#Visualizar
0003#STR0003#ALL#Incluir
0004#STR0004#ALL#Modificar
0005#STR0005#ALL#Borrar
0006#STR0006#ALL#Checklist APQP - A8 PLAN DE CONTROL
0007#STR0007#ALL#Si
0008#STR0008#ALL#No
0009#STR0009#ALL#Visualizar/Imprimir
0010#STR0010#ALL#Item - Pregunta
0011#STR0011#ALL#Si/No
0012#STR0012#ALL#Comentarios/Accion Requerida
0013#STR0013#ALL#Responsable
0014#STR0014#ALL#Fch. Prevista
0015#STR0015#ALL# La metodologia del plan de control referenciada en la
0016#STR0016#ALL#    Seccion 6 fue utilizada en la preparacion del plan de control?
0017#STR0017#ALL# Todas las preocupaciones conocidas del cliente fueron
0018#STR0018#ALL#    identificadas para facilitar la seleccion de caracteristicas
0019#STR0019#ALL#    especiales de producto/proceso?
0020#STR0020#ALL# Todas las caracteristicas especiales del producto/proceso
0021#STR0021#ALL#    estan incluidas en el plan de control?
0022#STR0022#ALL# Se utilizaron SFMEA, DFMEA y PFMEA para preparar
0023#STR0023#ALL#    el plan de control?
0024#STR0024#ALL# Todas las especificaciones de material que necesitan de
0025#STR0025#ALL#    inspeccion fueron identificadas?
0026#STR0026#ALL# El plan de control indica el recibimiento (material y
0027#STR0027#ALL#    componente) por medio de procesamiento/montaje,
0028#STR0028#ALL#    incluyendo embalaje?
0029#STR0029#ALL# Los requisitos de prueba de ingenieria fueron
0030#STR0030#ALL#    test de ingenieria?
0031#STR0031#ALL# Dispositivos de medicion y equipamientos de prueba estan
0032#STR0032#ALL#    disponibles conforme fue requerido por el plan de control?
0033#STR0033#ALL# �Si necesario, el cliente aprobo el plan de control ?
0034#STR0034#ALL# Los Metodos de medicion son compatibles entre
0035#STR0035#ALL#     proveedor y cliente?
0036#STR0036#ALL#Imprimir
0037#STR0037#ALL#Vis/Prn
0038#STR0038#ALL#N/a
0039#STR0039#ALL#�La Metodologia del plan de control descrita 
0040#STR0040#ALL#en el Capitulo 6 del manual APQP se utilizo en el 
0041#STR0041#ALL#desarrollo del plan de Control?
0042#STR0042#ALL#�Todos los controles identificados en la PFMEA se 
0043#STR0043#ALL#incluyeron en el plan de control?
0044#STR0044#ALL#�Se usaron DFMEA y PFMEA para preparar el 
0045#STR0045#ALL#plan de control ?
0046#STR0046#ALL#�Los requisitos de prueba de desempeno de ingenieria
0047#STR0047#ALL#y requisitos dimensionales se identificaron ? 
0048#STR0048#ALL#La  Metodologia y compatibilidad de los dispositivos de
0049#STR0049#ALL#medicion son apropiadas para atender a los requisitos
0050#STR0050#ALL#del Cliente:
0051#STR0051#ALL#�El  analisis de los sistemas de medicion se concluyo de 
0052#STR0052#ALL#acuerdo con los requisitos del cliente?
0053#STR0053#ALL#�Los tamanos de las muestras se basaron en las normas de la
0054#STR0054#ALL#industria, tablas estadisticas del plan de muestras
0055#STR0055#ALL#o en otros metodos de control de proceso?
0056#STR0056#ALL#A8 Plan de Control en version diferente
0057#STR0057#ALL#Esta Lista de Verificacion del Plan de Control 
0058#STR0058#ALL#Se hizo en version diferente a la Configurada en el Parametro MV_QAPQPED
0059#STR0059#ALL# , Cambie el Valor de ese Parametro en el Configurador para poder Visualizar, Excluir y Modificar esta Lista
0060#STR0060#ALL# 2� EDICION APQP 
 

QPPA320_PT-BR.TRES

 0001#STR0001#ALL#Pesquisar
0002#STR0002#ALL#Visualizar
0003#STR0003#ALL#Incluir
0004#STR0004#ALL#Alterar
0005#STR0005#ALL#Excluir
0006#STR0006#ALL#Checklist APQP - A8 PLANO DE CONTROLE
0007#STR0007#ALL#Sim
0008#STR0008#ALL#Nao
0009#STR0009#ALL#Visualizar/Imprimir
0010#STR0010#ALL#Item - Pergunta
0011#STR0011#ALL#Sim/Nao
0012#STR0012#ALL#Comentarios/Acao Requerida
0013#STR0013#ALL#Responsavel
0014#STR0014#ALL#Dt. Prevista
0015#STR0015#ALL# A metodologia do plano de controle referenciada na
0016#STR0016#ALL#    Secao 6 foi utilizada na preparacao do plano de controle ?
0017#STR0017#ALL# Todas as preocupacoes conhecidas do cliente foram
0018#STR0018#ALL#    identificadas para facilitar a selecao de caracteristicas
0019#STR0019#ALL#    especiais de produto/processo ?
0020#STR0020#ALL# Todas as caracteristicas especiais do produto/processo
0021#STR0021#ALL#    estao incluidas no plano de controle ?
0022#STR0022#ALL# Foram usados SFMEA, DFMEA e PFMEA para preparar
0023#STR0023#ALL#    o plano de controle ?
0024#STR0024#ALL# Todas as especificacoes de material que necessitam de
0025#STR0025#ALL#    inspecao foram identificadas ?
0026#STR0026#ALL# O plano de controle indica o recebimento (material e
0027#STR0027#ALL#    componente) atraves de processamento/montagem,
0028#STR0028#ALL#    incluindo embalagem ?
0029#STR0029#ALL# Os requisitos de teste de engenharia foram
0030#STR0030#ALL#    identificados ?
0031#STR0031#ALL# Dispositivos de medicao e equipamentos de teste estao
0032#STR0032#ALL#    disponiveis conforme requerido pelo plano de controle ?
0033#STR0033#ALL# Se necessario, o cliente aprovou o plano de controle ?
0034#STR0034#ALL# Os Metodos de medicao sao compativeis entre
0035#STR0035#ALL#     fornecedor e cliente ?
0036#STR0036#ALL#Imprimir
0037#STR0037#ALL#Vis/Prn
0038#STR0038#ALL#N/a
0039#STR0039#ALL#A Metodologia do plano de controle descrita 
0040#STR0040#ALL#no Capitulo 6 do manual APQP foi utilizada no 
0041#STR0041#ALL#desenvolvimento do plano de Controle?
0042#STR0042#ALL#Todos os controles identificados na PFMEA foram 
0043#STR0043#ALL#inclusos no plano de controle?
0044#STR0044#ALL#Foram usadas DFMEA e PFMEA para preparar o 
0045#STR0045#ALL#plano de controle ?
0046#STR0046#ALL#Os requisitos de teste de desempenho de engenharia
0047#STR0047#ALL#e requisitos dimensionais foram identificados ? 
0048#STR0048#ALL#A  Metodologia e compatibilidade dos dispositivos de
0049#STR0049#ALL#medi��o s�o apropriadas para atender aos requisitos
0050#STR0050#ALL#do cliente?
0051#STR0051#ALL#A  an�lise dos sistemas de medi��o foi conclu�da de 
0052#STR0052#ALL#acordo com os requisitos do cliente?
0053#STR0053#ALL#Os tamanhos das amostras foram baseadas nas normas da
0054#STR0054#ALL#industria, tabelas estat�sticas do plano de amostragem
0055#STR0055#ALL#ou em outros m�todos de controle de processo?
0056#STR0056#ALL#A8 Plano de Controle em vers�o diferente
0057#STR0057#ALL#Esta Lista de Verifica��o do Plano de Controle 
0058#STR0058#ALL#Foi feita em vers�o diferente da Configurada no Par�metro MV_QAPQPED
0059#STR0059#ALL# , Mude o Valor desse par�metro no configurador para poder Visualizar, Excluir e Alterar esta Lista
0060#STR0060#ALL# 2� EDI��O APQP 
 

QPPA320_PT-PT.TRES

 0006#STR0006#ALL#Invent�rio Apqp - A8 Plano De Controlo
0008#STR0008#ALL#N�o
0009#STR0009#ALL#Visualizar/imprimir
0011#STR0011#ALL#Sim/n�o
0012#STR0012#ALL#Coment�rios/ac��o Requerida
0013#STR0013#ALL#Respons�vel
0015#STR0015#ALL# A metodologia do plano de controlo referenciada na
0016#STR0016#ALL#    sec��o 6 foi utilizada na prepara��o do plano de controlo ?
0017#STR0017#ALL# Todas as preocupa��es conhecidas do cliente foram
0018#STR0018#ALL#    identificadas para facilitar a selec��o de caracter�sticas
0019#STR0019#ALL#    especiais de artigo/processo ?
0020#STR0020#ALL# Todas as caracter�sticas especiais do artigo/processo
0021#STR0021#ALL#    est�o inclu�das no plano de controle ?
0024#STR0024#ALL# Todas as especifica��es de material que necessitam de
0025#STR0025#ALL#    inspec��o foram identificadas ?
0026#STR0026#ALL# O plano de controlo indica o recebimento (material e
0027#STR0027#ALL#    componente) atrav�s de processamento/montagem,
0028#STR0028#ALL#    Incluir embalagem ?
0031#STR0031#ALL# Dispositivos de medi��o e equipamentos de teste est�o
0032#STR0032#ALL#    dispon�veis cofacturaorme requerido pelo plano de controlo ?
0033#STR0033#ALL# Se necess�rio, o cliente aprovou o plano de controlo ?
0034#STR0034#ALL# Os M�todos de medi��o s�o compat�veis entre
0037#STR0037#ALL#Vis/prn
0039#STR0039#ALL#A Metodologia do plano de controlo descrita 
0040#STR0040#ALL#no Cap�tulo 6 do manual APQP foi utilizada no 
0041#STR0041#ALL#desenvolvimento do plano de controlo?
0042#STR0042#ALL#Todos os controlos identificados na PFMEA foram 
0043#STR0043#ALL#inclusos no plano de controlo?
0045#STR0045#ALL#plano de controlo ?
0054#STR0054#ALL#ind�stria, tabelas estat�sticas do plano de amostragem
0055#STR0055#ALL#ou em outros m�todos de controlo de processo?
0056#STR0056#ALL#A8 Plano de Controlo em vers�o diferente
0057#STR0057#ALL#Esta Lista de Verifica��o do Plano de Controlo 
0059#STR0059#ALL# , mude o Valor desse par�metro no configurador para poder Visualizar, Eliminar e Alterar esta Lista
 

QPPA320_RU.TRES

 0001#STR0001#ALL#����� 
0002#STR0002#ALL#��� 
0003#STR0003#ALL#���
0004#STR0004#ALL#��������
0005#STR0005#ALL#�������
0006#STR0006#ALL#Checklist APQP - A8 CONTROL PLAN
0007#STR0007#ALL#�� 
0008#STR0008#ALL#��
0009#STR0009#ALL#View/Print
0010#STR0010#ALL#Item - Question
0011#STR0011#ALL#Yes/No
0012#STR0012#ALL#Comments/Required Action
0013#STR0013#ALL#Responsible
0014#STR0014#ALL#Estimated Dt
0015#STR0015#ALL# Methodology of control plan referenced in 
0016#STR0016#ALL#    Section 6 used in the preparation of the control plan ?
0017#STR0017#ALL# Were all customer concerns 
0018#STR0018#ALL#    to make the selection of special characteristics
0019#STR0019#ALL#    of products/process easier ?
0020#STR0020#ALL# All special features of product/process 
0021#STR0021#ALL#    included in the control plan ?
0022#STR0022#ALL# Were SFMEA, DFMEA and PFMEA used to prepare 
0023#STR0023#ALL#    the contol plan ?
0024#STR0024#ALL# All material specifications that require 
0025#STR0025#ALL#    inspection identified ?
0026#STR0026#ALL# Control plan indicates receipt (material and 
0027#STR0027#ALL#    components) through the processing/assembly
0028#STR0028#ALL#    including the packing?
0029#STR0029#ALL# Engineering test requirements were 
0030#STR0030#ALL#    identified ?
0031#STR0031#ALL# Measurement devices and test equipment are 
0032#STR0032#ALL#    according to what was required by the control plan ?
0033#STR0033#ALL# If necessary, did the customer approve the control plan?
0034#STR0034#ALL# Measurement methods are compatible between 
0035#STR0035#ALL#     supplier and customer?
0036#STR0036#ALL#���. 
0037#STR0037#ALL#Viw/Prn
0038#STR0038#ALL#N/a
0039#STR0039#ALL#Was Methodology of control plan, described  
0040#STR0040#ALL#in Chapter 6 of APQP manual, used to  
0041#STR0041#ALL#design the control plan?
0042#STR0042#ALL#Were all controls identified in PFMEA  
0043#STR0043#ALL#added to control plan?
0044#STR0044#ALL#Were DFMEA and PFMEA used to prepare  
0045#STR0045#ALL#the control plan?
0046#STR0046#ALL#Were test requirements of engineering performance 
0047#STR0047#ALL#and dimensional requirements identified? 
0048#STR0048#ALL#Are methodology and measurement devices 
0049#STR0049#ALL#compatibility prepared to meet customer 
0050#STR0050#ALL#requirements?
0051#STR0051#ALL#Was the analysis of measurement systems finished  
0052#STR0052#ALL#according to customer requirements?
0053#STR0053#ALL#Were sizes of samples based on regulations of 
0054#STR0054#ALL#industry, statistical tables of sampling plan 
0055#STR0055#ALL#or other methods of process control?
0056#STR0056#ALL#A8 Control Plan in different version 
0057#STR0057#ALL#This Check List of Control Plan  
0058#STR0058#ALL#was made in a different version from the one configured in parameter V_QAPQPED.
0059#STR0059#ALL# Change this parameter content in Configurator so you can View, Delete and Change this List.
0060#STR0060#ALL# 2ND EDITION APQP 
 

 

 

Gostou? Compartilhe com seus amigos e deixe um comentário!

Um abraço, e até a próxima  

 

ASSINE A NEWSLETTER

Cadastrando...

PIX uDesenv

PIX QR Code para depósito

Clique para doar

Parceiros

Tudo em ADVPL - Blog parceiro

Blog ADVPL